The final launch preparations started at 10pm. The detectors were driven cold using the ground cooling approach with Nitrogen. During this period check-out tests with X-ray tube and atmospheric muons […]
Continue reading »The final launch preparations started at 10pm. The detectors were driven cold using the ground cooling approach with Nitrogen. During this period check-out tests with X-ray tube and atmospheric muons […]
Continue reading »